{
  "source": "Cooked Index — occupational AI risk register",
  "page": "https://cookedindex.com/jobs/architects-except-landscape-and-naval/",
  "methodology": "https://cookedindex.com/methodology",
  "notice": "Verdicts are re-examined as evidence accumulates. Re-fetch before relying on this; the page above always carries the current score.",
  "scored_at": "2026-08-11",
  "model": "claude-opus-5",
  "occupation": {
    "title": "Architects, Except Landscape and Naval",
    "soc_code": "17-1011",
    "category": "Engineering",
    "us_employment": 106770,
    "median_annual_wage": 99280
  },
  "verdict": "EXPOSED",
  "risk_resistance": 61,
  "contested": false,
  "near_boundary": false,
  "dimensions": {
    "task_resistance": 11,
    "embodiment": 9,
    "liability_shield": 15,
    "trust_premium": 12,
    "judgment_accountability": 14
  },
  "reasoning": {
    "task_resistance": "Schematic massing, IBC egress and occupancy checks, sheet-set coordination in Revit, and outline specs are all being absorbed by generative and parametric tooling, but detailing an unbuilt wall assembly, RFI resolution during construction, and reconciling a client's program against a site's setbacks still require someone in the loop — a mixed 11, not a 6, because the non-automatable share is real work, not just sign-off.",
    "embodiment": "Site visits, punch lists, and observing whether the flashing was actually installed as detailed put you in unfinished buildings with hard hats several times a month, but the other four days a week are Revit, Bluebeam, and consultant calls — a 9, not a 15, because the field time is inspection rather than execution.",
    "liability_shield": "The registered architect's seal on construction documents is required by state practice acts before a permit issues, and that seal carries personal liability for egress, fire separations, and structural coordination through the statute of repose — an unlicensed person genuinely cannot substitute, which is why this sits at 15 rather than mid-range.",
    "trust_premium": "Owners select architects on portfolio and interviews and stay through multi-year projects and repeat commissions, but many commodity commissions — tenant fit-outs, developer prototypes, public RFQs scored on fee — are awarded on price and qualifications rather than a personal bond, keeping this at 12 instead of the high teens.",
    "judgment_accountability": "You decide the exit stair count, the fire rating strategy, and which of three code-compliant options the owner can actually afford, then defend those calls to a plans examiner and potentially a jury after a fire — high-stakes and ambiguous, but bounded by IBC, ADA, and consultant sign-offs rather than made from nothing, hence 14."
  },
  "rationale": "The production layer of architecture — massing studies, rendering, sheet sets, zoning and code checks, specification writing, permit paperwork — is exactly where generative tools and parametric BIM automation are landing hardest, and that layer is where most billable hours of a median architect actually sit. What holds is the licensed stamp on construction documents, the personal liability for life-safety decisions, construction administration on active job sites, and the client and consultant negotiation that resolves conflicting budget, code, and program demands. Expect the same split seen in software: fewer people producing drawings, the same or fewer people signing them and owning the outcome.",
  "outlook": "By 2035 firms will produce documents with a fraction of today's drafting staff, and the surviving roles concentrate in licensed principals, code and life-safety specialists, and field-side construction administrators.",
  "what_would_raise_it": {
    "levers": [
      {
        "dimension": "liability_shield",
        "change": "State licensing boards (via NCARB/AIA model language) adopting rules that AI-generated construction documents require a licensed architect's stamp plus a documented human review log, and that a licensed architect cannot delegate code-compliance determinations to software — analogous to engineering boards' existing 'responsible charge' rules. Professional liability insurers (e.g. Victor/AIA-endorsed programs) adding endorsements that void coverage absent named-architect review of automated output pushes the same direction.",
        "plausibility": "plausible",
        "would_add": 3
      },
      {
        "dimension": "judgment_accountability",
        "change": "Building codes and AHJ practice increasingly requiring performance-based alternate-means-and-methods submissions (already common in IBC Ch.1 alternate compliance and in mass-timber/tall-wood approvals), where a named architect argues life-safety equivalence before a board rather than checking prescriptive tables. Also expanded jurisdictional design-review and resilience/embodied-carbon boards putting contested discretionary calls on a signing human.",
        "plausibility": "already happening",
        "would_add": 3
      },
      {
        "dimension": "task_resistance",
        "change": "Genuine two-tier job: if generative massing, sheet production, spec writing and permit paperwork are largely automated, the residual role is construction administration, RFI/change-order adjudication, consultant coordination and client program negotiation — tasks whose share of the day rises mechanically even with no capability change. Watch fee structures shifting from percentage-of-drawings toward CA-weighted and owner's-representative billing.",
        "plausibility": "already happening",
        "would_add": 3
      },
      {
        "dimension": "embodiment",
        "change": "Contractual expansion of on-site duties: AIA B101 additional-services CA scopes, lender- or insurer-required site observation reports, and post-Surfside-style facade/structural inspection mandates (Florida SB 4-D milestone inspections, NYC LL 11) that name an architect or engineer for physical field verification and punch-list judgment.",
        "plausibility": "already happening",
        "would_add": 2
      },
      {
        "dimension": "trust_premium",
        "change": "Narrow route only: high-end residential, cultural, and institutional clients who buy an identified authorial designer. This is a small share of the 106,770 and does not scale to the median commercial/production architect; no realistic mechanism makes developer clients pay a premium for human-drawn documents.",
        "plausibility": "unlikely",
        "would_add": 1
      }
    ],
    "ceiling_note": "The stamp protects the signature, not the headcount. Liability and accountability levers can hold the score for the architects who sign, while total employment falls — a firm can stamp far more square footage per licensed person than before. Ceiling realistically ~72-75."
  },
  "adjudication": null,
  "employment_history": {
    "points": [
      {
        "y": 2017,
        "emp": 103110,
        "wage": 78470
      },
      {
        "y": 2018,
        "emp": 104360,
        "wage": 79380
      },
      {
        "y": 2019,
        "emp": 105850,
        "wage": 80750
      },
      {
        "y": 2020,
        "emp": 103900,
        "wage": 82320
      },
      {
        "y": 2021,
        "emp": 100400,
        "wage": 80180
      },
      {
        "y": 2022,
        "emp": 107490,
        "wage": 82840
      },
      {
        "y": 2023,
        "emp": 111170,
        "wage": 93310
      },
      {
        "y": 2024,
        "emp": 111140,
        "wage": 96690
      },
      {
        "y": 2025,
        "emp": 106770,
        "wage": 99280
      }
    ],
    "from": 2017,
    "to": 2025,
    "change_pct": 3.5,
    "comparable_from": 2019,
    "spans_soc_revision": true
  },
  "pivots": [],
  "license": "https://cookedindex.com/terms"
}