← Risk register SOC 17-1022 · reviewed 2026-08-11

Surveyors

50,830 US workers · median $75,440/yr · Engineering

SAFE

The modal surveyor splits time between field data collection with GPS/GNSS and total stations across raw terrain, and office work reducing that data into plats and legal descriptions. The office half — CAD drafting, coordinate math, deed text parsing, report generation, point-cloud processing — is being automated fast, but the licensed determination of where a boundary legally sits from conflicting deeds, old monuments, and occupation evidence is a judgment call a Professional Land Surveyor must seal and defend in court. Drones and scanners raise per-surveyor output rather than eliminating the person who must set the pin and own the call; note that the licensure shield is regulatory and could be loosened.

10-year outlook: Headcount stays roughly flat to modestly up on infrastructure and construction demand, but the office-drafting half of the job compresses hard — value concentrates in licensed surveyors who resolve contested boundaries and seal the work.

Score — 72/100 resistance

Five dimensions, 0–20 each, summed. Higher means more protected. The arithmetic is shown so you can check it: 13 + 16 + 17 + 10 + 16 = 72.

Task resistance 13/20

Mixed — a routine tier and a judgment tier. 13 rather than 17 because the traverse itself, robotic total station operation, drone flight lines, point-cloud registration and even preliminary deed plotting are already software-driven — what holds the score up is monument recovery, following footsteps of the original surveyor, and reconciling a fence line that contradicts the record, which no dataset supplies.

Embodiment 16/20

Hands-on in uncontrolled environments. 16 because you are locating pipes under blackberry thicket, chaining through wetland and snow, setting rebar and caps in frozen ground, and running control along live highway shoulders under MUTCD traffic setups — capped below 19 only because a growing share of hours are spent in the truck and at the CAD station rather than on the line.

Liability shield 17/20

Licensed human required and personally liable. 17 because a plat or ALTA/NSPS survey carries a PLS seal that binds one named individual under state board statute — a licence with a specific exam, four-year experience requirement, and revocation authority — and that seal is what makes the boundary admissible; short of 20 only because much crew work is legally delegable to unlicensed technicians.

Trust premium 10/20

Some relationship component. 10 because repeat title companies, civil engineers and developers pick a surveyor they know will not blow the closing date, and the neighbor dispute goes better if the landowners trust the person walking their line, but a subdivision plat is accepted on the seal and the record, not on who drew it.

Judgment & accountability 16/20

Exists to be accountable for ambiguous calls. 16 because you weigh senior rights, ambiguous calls-and-distances, unrecorded occupation, and a found monument of uncertain origin to decide which of two overlapping deeds controls — a decision that moves property value, gets deposed, and cannot be appealed to a procedure manual.

Confidence: high · reviewed 2026-08-11 · how scoring works

Tasks already automatable

What survives

Active moats: embodiment, licensure, judgment

How to future-proof this job

Field report — do you do this job?

Has AI actually changed your work?

Self-reported and unverified — a sentiment signal, not a survey. One response per person per occupation; you can change your answer.

From people who do this job

Nobody has filed one yet. If you do this work, you know things the rubric can't see.

What has actually changed in your work?

Concrete beats general: a tool that arrived, a task that moved, a headcount decision you watched happen. Don't include anything that identifies you or your employer if that would put you at risk.